• Home
  • About

Cheryl’s List #64 – March 15, 2002

March 15, 2002Cheryl's Listcheryl

1. CPU Chart Update
2. Adabas Update
3. CICS Response Time Spikes

1.  CPU Chart Update

I just realized that I had neglected to copy over updates for the IBM G2 through G5 processors with the latest OS/390 R10 LSPRs.  That means that the February CPU Chart that you were just sent needs to be updated.  We’ll be sending out a March 2002 CPU Chart with the latest ratings next week.  I’m sorry if this has caused any inconvenience.

2. Adabas Update

We sent out my SHARE presentation, “Cheryl’s Hot Flashes #7,” last week to our electronic subscribers.  In it, there was a note about a CPU increase (instead of the expected decrease) that Wolfgang Schott of IT-Austria had seen with Adabas when moving to a z900 from a G6 processor.  Strobe reports showed it appeared to be a problem similar to the cache problem found and resolved in SAS.  My note, however, referred to Adabas in general, when, in fact, the increased CPU times were only occurring in a single utility, ADACMP, a CPU intensive compress utility. Software AG is currently investigating this and has provided IT-Austria a fix for testing.

3.  CICS Response Time Spikes

A customer is seeing a severe increase in CICS response times that seem to be concurrent with the SMF interval and sync times.  The usual cause for this is having DDCONS(YES) specified in SMFPRMxx.  In this customer site, DDCONS(NO) was specified.  Has anyone else experienced this problem, and (if so) what was the resolution?

Stay tuned!

Search this site

Subscribe to our Cheryl’s List blog

listSign up for Cheryl's List

Latest Posts

  • Cheryl Watson’s Tuning Letter 2024 No. 2 Now Available
  • W&W Guide to SHARE in Kansas City (Part 3)
  • W&W Guide to SHARE in Kansas City (Part 2)
  • W&W Guide to SHARE in Kansas City (Part 1)
  • Big News for Fans of Cheryl Watson’s Tuning Letter
  • Cheryl Watson’s Tuning Letter 2024 No. 1 Now Available
  • Join Cheryl and Other Industry Leaders to Hear Their Views on the Next 60 Years for the Mainframe
  • Latest News on Cheryl Watson’s Tuning Letter
  • W&W Guide to SHARE in Orlando 2024 (Part 2)
  • W&W Guide to SHARE in Orlando 2024 (Part 1)

PO Box 3336
Sarasota, FL 34230
admin@watsonwalker.com

Copyright 2024 © Watson & Walker, Inc.